Skip to main content

Sub-Zero Triple Installation

Topics:

  • Can Sub-Zero units be installed 3 in a row?
  • Are there specifications for a triple installation of Sub-Zero units?
  • Is a heater kit or dual installation kit needed for triple installation?

Answer:

Any number of multiple Sub-Zero units can be installed together in combination or in a row. Keep the following in mind:

  • A heater is needed between each pair of units if there is less than a 2" filler in between the units.
  • For hinge to hinge installations, use 90° door stops to prevent cabinet damage.
  • Add the individual unit widths together for the overall opening width.
  • Classic Series (CL) units can be installed right next to each other in a triple flush inset installation.
  • See also, Sub-Zero Dual Installation Kit Information.

Refer to the Sub-Zero Design Guide for design specifications.

DID THIS ANSWER YOUR QUESTION?

Need further assistance? Contact Customer Care at 800.222.7820 or provide your information below and request a Customer Care representative contact you.

Ask Your Question

We're standing by with answers

Whether you're shopping for appliances or have questions about those you already own, we've got the resources you need. Talk directly to a customer care expert at the Sub-Zero, Wolf, and Cove service center, or connect with an appliance consultant at an official showroom near you. Get quick answers online, or reach a certified service provider or installer. And much more.

 

Call us at (800) 222-7820